How Power Pole Installation Works
From Site Visit to Switch-On
Installing or replacing a private power pole involves your property, the electricity network and a few compliance steps. Because High Demand Power Poles is a licensed Level 2 Accredited Service Provider (Licence 397193C), one team handles all of it: the pole, the connection to Ausgrid or Endeavour Energy, and the paperwork.
Contact US

When You'll Need This Process
The same process applies whether you're putting in a new pole or replacing an old one. Common reasons include:
- A new home, granny flat or subdivision needing supply
- A condemned or defect-noticed private pole
- A rotted, leaning or termite-damaged timber pole
- Storm or impact damage to an existing pole
- Upgrading from single phase to three phase
- Temporary supply for a building site
- Relocating a pole for a driveway or extension
- Switching to a steel or composite pole
Choosing the Right Pole
- Treated Hardwood Timber
Lowest upfront cost. Needs regular inspection because rot and termites usually start at ground level. - Galvanised Steel
Rot-free and termite-proof. A popular upgrade when replacing a timber pole. - Composite / Fibreglass
Won't rot, rust or corrode. Best for coastal and bushland properties.
The Installation Process, Step by Step
Site Inspection
We check the existing pole or new location, the service line route, clearances to buildings and driveways, and ground conditions.
Fixed Written Quote
You get a written quote covering the pole, labour, network coordination and paperwork, so there are no surprises on the day.
Network Booking
We lodge the notification with Ausgrid or Endeavour Energy and book any disconnection needed. You don't need to call the network yourself.
Dial Before You Dig
We check for underground services before digging and set up the work area safely, with traffic control if the job is near a road.
Pole Installation and Connection
The old pole is removed if needed, the new pole is set and footed, fittings and service cable go on, and your supply is reconnected and tested.
Certificate and Paperwork
You receive the Certificate of Compliance for Electrical Work (CCEW), and we submit the network completion paperwork.

What We Handle For You
- Network notification and disconnection booking
- Dial Before You Dig checks
- Old pole removal when replacing
- Testing before your power goes back on
- CCEW and completion paperwork
Why Sydney Chooses Us for Pole Installation
When you choose High Demand Power Poles, one licensed team takes your job from first visit to final certificate. Here's what sets us apart:
- Licensed Level 2 ASP, Licence 397193C
- Work across both Ausgrid and Endeavour Energy areas
- Timber, steel and composite poles installed
- Single phase and three phase supplies
- Outage window agreed with you before the work day
- Honest advice on the right pole for your site
FAQs
Planning a pole installation or replacement? Here are the questions we're asked most.
The on-site work is usually completed in one day. The overall timeline depends mostly on the network booking for the disconnection, so we lodge it as early as possible.
Yes, for part of the day during a replacement. We confirm the outage window with you in advance so you can plan around it.
Usually only at the start and end of the day, so we can confirm access and show you the finished work.
The property owner. That means repairs and replacement are the owner's responsibility, not the network's.
No. As a Level 2 ASP, we lodge the notification and coordinate the disconnection and reconnection with your network for you.
Testimonials
Ready to get your power pole sorted?
Fill out the form and our expert team will get back to you shortly. Whether it’s an emergency or a planned installation, we’re ready to help: fast, safe, and professional.