Power Pole Jobs We've Completed Across Sydney
Real jobs from the High Demand Power Poles team: what we were called out for, what we did and how it finished.

Emergency Pole Replacement After Storm Collapse, Seaforth
A private power pole collapsed in a storm at this Seaforth property and Ausgrid disconnected the supply for safety. A Level 2 ASP was urgently needed to replace the pole and restore the overhead supply.
View case study →
Rusted Steel Private Pole Replacement, Middle Cove
The owner of this Middle Cove home received an Ausgrid defect notice for a private steel pole that had rusted badly at the base. Only a licensed Level 2 ASP can disconnect, remove and replace a live pole like this. The old pole also sat close to the water mains, so the new one had to be repositioned.
View case study →
Timber Private Pole Replacement, Menangle Park
A deteriorated timber private pole at this Menangle Park property had reached the end of its service life and was a safety risk. Because the pole carries the point of attachment, only a Level 2 ASP can lawfully disconnect and reconnect the network supply.
View case study →
Timber Private Pole Replacement and Overhead Mains, Yerrinbool
An ageing private pole supporting several supplies at this Yerrinbool site had become unstable. It needed to be replaced and the overhead service restored safely, with the work done on a weekend to limit disruption.
View case study →
Emergency Pole Replacement After Lightning Strike, Cronulla
During a severe storm, lightning struck a private power pole in Cronulla and brought the pole and switchboard down, leaving live conductors exposed. A Level 2 ASP was urgently needed to make the site safe, replace the damaged infrastructure and restore supply.
View case study →
Private Power Pole and Consumer Mains Upgrade, Gymea Bay
A failed point of attachment bracket at this Gymea Bay home left overhead conductors exposed, a serious safety risk. The private pole and consumer mains no longer met current standards, and a Level 2 ASP was needed to isolate the overhead service before work could start.
View case study →
Fallen Pole Replacement and Switchboard Upgrade, Bilgola Plateau
A private power pole had fallen at this Bilgola Plateau property, leaving the premises without a safe and stable electrical supply. The pole needed urgent replacement, along with an upgrade of the electrical setup to get power back on.
View case study →
Private Power Pole Replacement, Picnic Point
The existing steel service pole at this Picnic Point property had deteriorated badly and was a safety risk, with the power supply to the home at risk of failing. Because the overhead consumer mains had to be disconnected and reconnected, the job needed a licensed Level 2 ASP electrician.
View case study →
Fallen Pole Replacement and Three Phase Service Restoration, Padstow
A fallen power pole at a multi-dwelling property in Padstow left six townhouses without power and created an urgent safety hazard. The three phase supply had to be fully restored and commissioned before residents could return to the site.
View case study →
Private Pole and Three Phase Supply in Eastwood
A new duplex development in Eastwood needed permanent three phase supply, with underground consumer mains to each meter panel. Installing private poles, overhead service mains and network connections is Level 2 ASP work.
View case study →
Private Pole for a Knockdown Rebuild in Ryde
An existing house in Ryde was about to be demolished, and the aerials had to come off it first. The supply needed moving to a new private pole for the builder. Overhead service work is Level 2 ASP work.
View case study →
Core Drilled Pole and Builders Supply in Malabar
A Malabar home was due to be demolished, and the builder needed the power disconnected and a temporary builders supply. The pole had to sit behind a wall, with the overheads coming from the street pole nearest the water so they would not cross the front of the house. This is Level 2 ASP work.
View case study →
New Pole and Three Phase Upgrade in Vaucluse
The owners of a Vaucluse property wanted the point of attachment moved about 3 metres further back and the supply upgraded to three phase. That meant a new private pole, new overhead service mains and network connection work, all Level 2 ASP work.
View case study →
Builders Supply to Permanent Board in Loftus
Construction at a Loftus home had reached the point where the temporary builders supply could come off and the meter could move to the new board. Disconnection and reconnection work at the pole is Level 2 ASP work.
View case study →
Private Pole Mains Connection in Sylvania
A builder in Sylvania needed the consumer mains from a new home connected at the top of its private pole to the aerial. Connections at the pole are Level 2 ASP work.
View case study →
New Pole and Builders Supply in Ryde
A building site in Ryde needed a temporary builders supply on a new pole, with the existing overhead lines moved across to it. Pole and overhead work is Level 2 ASP work.
View case study →
Builders Supply Removal and Meter Relocation in Sans Souci
A Sans Souci build was ready to come off temporary power. The meter needed relocating and the supply connecting onto new service mains already in position. Disconnection and reconnection work is Level 2 ASP work.
View case study →
Duplex Private Pole and Three Phase Upgrade in Old Erowal Bay
A site in Old Erowal Bay was running on a single phase temporary pole, but the build had become a duplex. Both sides needed three phase from the street and the new side needed connecting. Pole installs, supply upgrades and new connections are Level 2 ASP work.
View case study →
Private Pole and Temporary Board Install in Lilli Pilli
The owners of a Lilli Pilli property did not want their overhead service crossing the driveway, and the site needed construction power for upcoming building works. Moving a point of attachment and running new service mains from the Ausgrid pole is Level 2 ASP work.
View case study →
Emergency Pole Replacement After a Sunday Outage in Blacktown
A Blacktown home lost power on a Sunday after Endeavour Energy cut the supply over unsafe consumer mains and arcing at the point of attachment. The timber pole was also termite damaged and unstable. Pole replacement and network connections are Level 2 ASP work.
View case study →
Leaning Private Pole and Corroded Meter Box Replaced in Rose Bay
The private pole at a Rose Bay home was leaning and corroded at the base, and the meter box had corroded too. Replacing a pole and reconnecting the overhead service mains is Level 2 ASP work.
View case study →
Collapsed Timber Pole Replaced After Hours in Chatswood
Strong winds brought down the power line at a Chatswood home, leaving the timber pole leaning over the footpath and resting on a tree. The network made it safe, but a Level 2 ASP was needed to repair the damage.
View case study →
Emergency Pole Replacement After a Vehicle Impact in Enfield
A vehicle struck the private power pole at an Enfield property and the supply needed to be made safe and restored urgently.
View case study →
Termite-Damaged Timber Pole Replaced With Galvanised Steel in Dulwich Hill
The existing timber pole at a Dulwich Hill property had been damaged by termites and was no longer safe to carry the service.
View case study →
Permanent Poles for a Two Dwelling Site in North Nowra
A North Nowra site with two dwellings needed its temporary builders supply pole replaced with a full-length pole, plus a second private pole for the second dwelling.
View case study →
Temporary Builders Supply Pole for a Duplex in West Ryde
A West Ryde duplex site needed its existing supply disconnected and temporary builders power set up on a private pole that will later become permanent.
View case study →
Second Private Pole for a Duplex in Georges Hall
A Georges Hall duplex already had a private pole on one side and needed a second for the other dwelling.
View case study →
Two New Poles Installed in Wentworthville
A Wentworthville site needed two new poles set in place for its supply.
View case study →
Private Pole and Three Phase Upgrade in Leichhardt
A Leichhardt property was moving to a three-phase supply with a new private pole and a pole-mounted main switchboard.
View case study →
Temporary Builders Supply and Private Pole in Rose Bay
A Rose Bay building site needed its existing supply disconnected and a temporary builders supply set up on a private pole for construction.
View case study →
Pole Replacement for Three Phase Supply in Earlwood
An Earlwood property's existing pole needed replacing as part of a move to three-phase supply, with family members at home throughout the works.
View case study →
Private Pole Install and Overhead Connection in North St Marys
A North St Marys property needed a private pole installed and connected to the overhead supply, ready for three-phase metering.
View case study →
Private Pole and Three Phase Switchboard in North Sydney
A North Sydney property needed a new private pole and a new three-phase main switchboard.
View case study →
Private Pole Install and Permanent Connection in Georges Hall
A Georges Hall property needed a new private pole and a permanent single-phase connection, with provision left for an underground supply later.
View case study →
New Private Pole and Overhead Service in Killara
A Killara property needed a new private pole with a single-phase overhead service from the network pole.
View case study →Request your free power pole quote
Fill out the form and our expert team will get back to you shortly. Whether it’s an emergency or a planned installation, we’re ready to help: fast, safe, and professional.