Timber Private Pole Replacement and Overhead Mains, Yerrinbool

Explore our private power pole services

Why we were called

An ageing private pole supporting several supplies at this Yerrinbool site had become unstable. It needed to be replaced and the overhead service restored safely, with the work done on a weekend to limit disruption.

What we did

  • Excavated the old footing and removed and disposed of the existing timber pole.
  • Installed a new 9.5m timber private pole, then backfilled and compacted it for stability.
  • Reconnected all the switchboards supplied from the pole, with isolation, termination, testing and reinstatement of supply.
  • Installed new overhead consumer mains with the required clearances.
  • Retensioned the existing overhead signals cable across three poles and fitted a new bracket where one had slipped.
  • Worked from an elevated work platform for safe access.

The result

The site now has a stable, compliant private pole supporting its multiple supplies, with overhead cables correctly tensioned and supported.

Switchboard and cabling at the base of a replacement timber pole at a Yerrinbool site

What our customers say

How a pole replacement works

Assess and make safe

We attend site, make the area safe and assess the pole, the supply and what the network requires.

Plan and approvals

We coordinate with your energy provider and organise the paperwork so you do not have to.

Replace the pole

Our Level 2 crew removes the old pole and installs the new one to network standards.

Test and reconnect

We test the installation, reconnect your supply and commission it before we leave.

Power pole FAQs

How long does a private power pole replacement take?

It depends on site access, the condition of the existing pole and the requirements of your energy provider. After we assess your site, we give you a clear timeframe before any work starts.

Who is responsible for a private power pole?

In most cases the property owner is responsible for a private pole and the supply line that runs from it to the property. We can inspect yours and confirm what applies to your situation.

Do I need a Level 2 ASP electrician?

Work that connects to the electricity network needs an accredited Level 2 ASP. High Demand Electrical is a Level 2 ASP, so we can handle the job from assessment through to reconnection and commissioning.

Do you handle emergencies like a fallen pole?

Yes. We are available 24/7 across Sydney. If a pole is down or damaged, call 0411 719 093.

SYDNEY’S PRIVATE POWER POLE SPECIALISTS

Need help with your power pole?
We’re ready.

From urgent repairs to planned installations, our Level 2 ASP team is available across Sydney.

24/7 Emergency AssistanceLicensed Level 2 ASPSydney-wide Service

Ready to secure your property with Power Poles service?

Fill out the form and our expert team will get back to you shortly. Whether it’s an emergency or a planned installation, we’re ready to help—fast, safe, and professional.